 |
| Amazing clouds rolling through! |
It was cloudy off an on last week. And God has a sense of humor. See, normally our problem is more time then materials. The last week – decent temps, plenty of materials, and NO TIME! UGH! Things were switched around at Mr. Man’s work, time will tell if its a good thing or not. But it meant he had to work almost 80 hours…
This week however, he has had a lack of work, which means lots of time working on the house!
 |
| This creepy bug is apparently called an Assassin bug – and they are everywhere!! Freaks me out now that I know about them!!! UGH!!! |
 |
| Front and back walls framed out |
 |
| With the makeshift sunshade |
 |
| First piece of upper OSB going up! |
 |
| Lots of breaks are required when it is over 100 degrees! |
 |
| I will be SO glad when all this roof work is done! |
The front is also done. Well mostly. We are short one sheet – kinda. See we purchased enough wall sheathing – but they messed up somehow and 2 sheets of flooring OSB was in the bundle. Soo… yea… another trip to the store for 2 more sheets, but 3 extra sheets of flooring…
Then one of Mr. Man’s friends showed up and I forgot to get a picture :- Next time!! Since we do not have the windows yet, we just framed out for a large stock window from Lowes with the thinking that we can always make it smaller if a smaller window is purchased.
Another big leap in progress!!